8/5/2023 0 Comments I5 traffic portlandIn addition to the bridge, the project includes two new public plazas and landings on the north and south sides of the bridge. When it opens in Summer 2022, the bridge will be seismically resilient and serve as a backup route for emergency vehicles over I-84 in the event of an earthquake. Following the initial bridge placement, crews will connect the bridge to the north landing as part of the final phase of construction. The bridge will then be attached to a temporary tower between the I-84 freeway and railroad tracks. and 400-foot-long bridge will be lifted and rolled into place over Sullivan’s Gulch. This work is weather dependent and the schedule may change.Īfter more than a year of construction to build the bridge’s foundations, the Portland Bureau of Transportation’s (PBOT) Congressman Earl Blumenauer Pedestrian and Bicycle Bridge is ready for the next phase of installation. The ramps to northbound and southbound I-5.įor real time traffic information during the closure, go to.The on-ramp from Northeast 33rd Avenue.The on-ramp from Northeast Sandy Boulevard.The on-ramp from Northeast Glisan Street, near 58th Avenue.The on-ramp from Northeast Halsey Street, near 82nd Avenue.The ramps from northbound and southbound I-205.I-84 westboundĪll I-84 westbound lanes will close at Interstate 205 including: On-ramps east of Cesar Chavez Boulevard will also remain open. The eastbound on-ramp from Cesar Chavez Boulevard will remain open. The eastbound on-ramp from Northeast 16th Avenue, will periodically open.The eastbound on-ramp from Northeast Grand Avenue, closing at 5 a.m.The ramps to I-84 from northbound and southbound I-5.Here are the closure details: I-84 eastboundĪll I-84 eastbound lanes will close from I-5 to Cesar Chavez Boulevard, including: In the future it will also serve as an important link in Portland’s Green Loop.īoth eastbound and westbound I-84, along with on-ramps, will be closed, with some variations, around the clock from 10 p.m. When open next year, the Blumenauer Bridge will connect pedestrians and people biking on Northeast 7th Avenue between the Lloyd and the Central Eastside neighborhoods. 8-11, while crews put in place the new Congressman Earl Blumenauer Pedestrian and Bicycle Bridge. 5, 2021) Interstate 84 east of Interstate 5 will close in both directions this weekend, Oct.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |